What modernising an old system covers
Five parts, usually starting with the audit. The order of the stages follows what gets in the way of daily work the most.
-
Technical audit of the system
The code, the database, the server or computer it runs on, security updates and access. The written report shows what works, what is risky and in what order to modernise.
The report can be used with another team too
-
Taking over a project from another team
The developer has left or the partner no longer replies. Existing access moves into the company’s name, the code goes into its repository and what exists is documented.
The system no longer depends on one person
-
Moving the data out of the old system
From Access, Excel, FoxPro, an old database or another program’s export. Every transfer is checked against the source before the team works in the new system.
Old records, available in the new system
-
Replacing it part by part
One part of the system is replaced at a time, for example orders, then stock. The team is trained on each new part before the switch.
No all-at-once move in a single day
-
Links to the website, 1C and other programs
The new system receives orders from the website and exchanges data with 1C, accounting or another program already in use, where that program allows data exchange. The 1C configuration is not changed.
Data is not entered twice
-
Something else?
A system nobody in the company can maintain any more, an old website that no longer gets updates, or a program that will not start on new computers. A few lines are enough; the reply comes within 3 working days.
Request a quote
Have your own developers and only need a code audit or a database migration? IT outsourcing by task
How an old system is modernised
In stages. Each delivered stage is paid separately, and the work can stop after any of them.
-
A few lines to start
What the program is, how long it has been in use, who maintains it today and what access exists to the code and the server, through the form on this page.
-
The quote, in writing
Within 3 working days: the quote for the audit, with a fixed price and date, or the questions still open.
-
The audit and the stage plan
A written report on the state of the system and its access, plus the plan of stages. Each stage gets its own fixed-price quote.
-
The stages, one at a time
Each new part is checked on a copy of the real data, then takes over the work. The studio stays after launch.
What a system really costs shows only after launch
- The old part keeps working until the new one has been checked on a copy of the real data.
- Each stage’s price is fixed in the written quote and paid after delivery. The work can stop after any stage, with everything done kept.
- What can change without a developer and the monthly server cost are written into the quote, before launch.
- The data processing agreement is signed before any access, and the database copy is kept only while the work lasts.
Before you write to us
How much does modernising an old system cost?
It depends on the size of the system, the data to move and the programs it has to connect to. The work usually starts with the audit, which has its own fixed price in the quote; after the audit, each stage gets its own fixed-price quote before it starts.
Does work have to stop during modernisation?
Not for the whole period. Each new part is checked on a copy of the real data, and switching it over needs a short pause for the last data transfer, agreed with the team in advance.
What happens to the data in the old system?
It moves into the new system, and the transfer is checked against the source: record counts, totals and samples chosen by the team. Duplicates and errors found are shown to the company before the move.
The developer who built our system is no longer available. Can you take it over?
Yes, if the running system and its database exist. Work starts only with the company’s written consent and only on code the company has the right to change: if the rights sit with the former developer or a vendor, the audit shows it. Without the source code, features are rebuilt from the running system and the data.
Rewrite from scratch or modernise in stages?
A small system with few links is sometimes cheaper to rebuild from scratch, and the audit says so. For a system the whole business relies on, stages keep the risk small: each part is checked before it takes over.
We already have an IT partner. Is a second quote worth it?
Yes, as a benchmark. A second quote shows what the same work costs designed differently: what is in it, the monthly server cost and what can change without a developer. There is no need to send the other company’s quote; a description of the work is enough.
Our old system is linked to 1C. What happens to 1C?
1C stays as it is: the studio does not change the configuration or move the database to a new 1C version. The new part uses the data exchange the configuration already has, checked before the quote. If there is no exchange, if data has to be loaded into 1C or if something changes in 1C, the company’s 1C partner does it, to a format agreed in writing.
What technology is the new system built with?
Widely used web technologies, documented, so another team can continue the work. The system opens in the browser on a computer and on a phone and needs an internet connection; where the server sits is agreed in the quote.
We start with the audit
A few lines about the program, how long it has been in use and who maintains it today are enough. The reply comes within 3 working days: the quote for the audit or the questions still open.